Videos

After Hours at Palmer

by patagucciplug
Aug 2019 - 2.3K views

The current Palmer chairlift was completed in 1996, and is built to withstand wind gusts of over 100 miles per hour (160 km/h) and 200 inches (510 cm) of snow. Its construction time was less than six months due to a limited building season imposed by the local weather conditions.[4]

Skiers;
Paul Conroy
Andrew Branch
Joey Van derMeer
Zach Pfeiffer

THINK - Zach Pfeiffer 19-20 Street Part

by patagucciplug
Nov 2020 - 3.8K views

My self edited street part from the 19-20 season. Most shots are recycled and re-edited from NEVERMIND, a film by Tristan Steen and Conor Smith. (Check that out if you haven't)
I can't thank everyone enough who helped make last winter happen. Big shoutout to all the homies that pointed a camera at me, you're making my dreams come true. I have endless gratitude for Vishnu for making it easy to beat on skis, Smokeproper and MutedLTD for trusting us with the funds to make it all happen, Tall T Productions for the gas gear they hooked it with, and Josh Berman at Level 1 for all the knowledge and the only roof I'd ever want over my head in CO.
THANK YOU anyone else I forgot to mention that helped us pull it all together. Its been a long ride since almost a year ago to the date of posting this and I'm extremely proud to put this out. Enjoy.