Update:
So its been a few days now and we have been out building every day. The park consists of 2 main lines.
#1: Dub Kink then a round 16' rail
#2: Choice of c-rail, box line, or green tube then into the big bank/quarter with pvc on top, then into the 18' square steel rail, then into a lipped pvc rail, then into a pvc boner type thing.
The second line still requires some work from the lipped pvc rail onwards. Should be completely done soonish. Still have a few features to place, such as a small pvc boner and a flat down shotgun rail.
Here are some of the most recent pictures
*we also are in the process of building two camo netted shelter thingys on top of the roll ins. Sooper thug lol.
***Tomorrow night the parks cherry will be popped and she will be open for the season haha!