Replying to long over due ALpine update
Nicks run - dialed in with 50 and 60 foot step downs and just re-introduced the c-rail as a down sprial to the left of the last jump. rails leading into the double line are 24 ft flat and 36ft up/flat/down.
Kangaroo run - 25, 33, 38, 45 jumps
32ft flat down rail, 36ft down/flat/down box, 24ft down box, 2-ft flat rail, 40ft up down rail....and the CONTRAPTION..20 ft up box to platue to small ledge with coping then back down the up box the way you came. Was the quarter pipe but we switched it up.
Superpipe is going to be closed mon-fri for a rebuild....great news...the Dragon is getting some serious fabricating done to it to get the tranny in line with the flat bottom...THIS MEANS NO MORE KINK AT THE FLATBOTTOM!!!!!
PARK IS BETTER THAN ITS BEEN ALL SEASON!!!
Mudflap
your friendly Apline park guy
Click to expand post