Replying to the long awaited park rebuild commences tomorrow
So after last weeks rain / freeze bullshit, we're ready to reconstruct. Here's the plan for tomorrows rebuild. There will be two lines, Line one will go like this, the 40 foot bannana, the 40 foot down kink, the 40 foot flat down flat, the c box and a jump. Line 2 will have a 20 foot flat, a 20 foot flat down, a 32 foot a frame box, a 36 foot trap into that same jump from Line one. Eventually, the 60 will make its way down to close out Line one, the Big air location will host a new intermediate park and the mini park will get some more tiny stuff to go with the 12 foot double, the butter box, the flat down flat box and the rain bow rail.
Oh yea, the new rain bow should be ready by next week, unless its as nice outside as it was today, cause not a lot of work happens when its this sunny, hot damn did you guys miss some good sessions today.