Welcome to the Newschoolers forums! You may read the forums as a guest, however you must be a registered member to post. Register to become a member today!
flat0Roll snowball till they are like 2-3 feet tall then put them together and add snow in between
theabortionatorHonestly a good option to start with is finding a location woth good terrain. A natural dip and then an up and breakover like a jump knuckle. This will make the jump ride bogger with way less time and snow and gove you a good landing.
Also can cut a lip into the sode of the hill so you're pulling snow from the higj sode to widen the low side.
Def depends on snowpack where you're at. Out west cutting blocks is the move but idk east coast.
The big builds in movies can be done over multiple days with a crew of people.
If you have a good spot that wont get torn down maybe chip away at it a little at at a time.
CaseyListen to the jump builder
jompcock