Welcome to the Newschoolers forums! You may read the forums as a guest, however you must be a registered member to post. Register to become a member today!
go two years back and thats what gulch needs to be.
dfd box one side, down rail other.
then flat rail with good landing, then jump
then trap rail or flat rial
rainbow rail or flat box
flat down box, flat rail
flat down box/rail
then the down rail thats a circle, put back as a semi up rail. soooo much fun, then into the 2 jumps,
with a dfd rail at the bottom left, and some rails next to the jumps.
bada bing bada boom