Yeah Seymour is killing it, the mushroom park has:
c rails both ways
corrugated pipe stall thing
little up rail
traffic barrier tap
spine/hump box
down flat rail, but kinda too low
2 stall rails
wallride on the side
perpendicular rail to the hill with no lip on
Mystery:
15+ foot table/stepdown
10-15ish step up
Lower Mystery:
Upper left line:
down corrugated pipe
down rail
Upper right line:
stall corrugated pipe with wedge to air/tap over the pipe
down box
after those there is a setup with an option of a down box, handrail, or flat down box setup urban style
to oval wallride
and like someone said above, they're starting on the lodge park with neon orange rails which looks as it is going to be awesome