So I know that there was a thread on it a bit back, but what is the plan for the park at Stevens this coming season(if we get enough snow to do what we want)? I'd love to see the pro line actually be big....that little waterfall was shit. As big distance as we can make them, with mediumish stack height kickers would be great, along with that big Such Is Life leftover jump that was up in 08. I also think that the top 5 jumps on the bigger line should be made into 3 jumps that are bigger with better landings...and that side run should have bigger jibs or rails or something instead of the tiny jibs that weren't used. Just some ideas...anybody know the plan?