The new trap box for ripley should be done early this week and hopefully out on the hill by next weekend. Its 30 feet long and 5 feet high with each section being 10 ft. This pic was taken last Thursday and since then the topsheet has been added and we are almost done putting the plywood on the sides. Then all we need to do is paint it and move it out. Check it out -> https://www.newschoolers.com/web/content/pictures/id/120019/
Also, we'll probably start on the flat down rail the week after, which shouldnt take nearly as long so maybe a week and a half to two weeks and we'll be bring that one out as well.