Posts: 5952
-
Karma: 2,423
I've got a few photos from today - I might get some posted later. The HL park on Whistler is being built now. The pipe is being cut and the table, left hip with up-down rail on top is still there, plus the two quarter pipes with the box bridging them. I spoke to one of the cat drivers the other night and he said he wasn't sure what was staying.
The regular park starts off with a nice long wide box to drop then the wallride. It then splits to S/M and M/L sides. The M/L side is a big hip to the right which you can hit straight on and go big, then either a high flat-down box or battleship rail. Then either a step up to double barrel street rail or the double kink box set up as an up-down-up (really cool). Then there's a few kickers - the first one is maybe 25ft now, then the second is steeper but a bit shorter and has a side transfer kicker to the same landing now. There are some rollers built to the side too that look like they will have smaller kickers on them. Then there is two street rails, one down and one mellow down-flat down, and on the right there is one other kicker and a step-up to step down that is pretty sketchy - you'll clear the step down landing if you don't speed check hard. The dragon rail is lying at the side and looks like it will go in on the right side, and there are lot of other rails not being used so hopefully more are coming out soon.