We've been busy digging out and rebuilding. Here's what's going on as of today.
Lost Dutchman:
LINE 1 (built)
c-rail
c-rail
house rail
down rail
jump(coming soon)
big house box
d/f/d box
u/d box (changing to a jump)
PLANNED LINE 2(work starts tonight)
down box
f/d box
45ft jump(was the 55fter)
flat rail
flat rail
d/f/d rail
PLANNED LINE 3(work starts tonight)
can get to from both 49er and Dutcham
6 20ft rails that will tie into line 2 after the 45ft jump
49er area:
line 1
40ft down rail
24ft upbox
wallride
c-box
watertower-wallride and pyramid hip built as one feature
c-box
s-box
line 2
go right after the first c-box
f/d rail
staircase-30steps 2 down ledges, d/f/d ledge
line 3
(3) 20ft tables
Accelerator:
the new night park is about half done.
line 1
down box(coming soon)
f/d box(coming soon)
splits left/right
to the left
30ft table
45ft step down
to the right
house box(coming soon)
d/f/d box(coming soon)
30ft jump(hopefully if the spacing works right)
lines merge
option of down rail-shark tooth(up/gap/down)
35ft channel transfer
jib island-
option 1 up box -butter pad -down box
option 2- step- up jump
option 3- up rail -butter pad - d/f/d rail
line 2
superpipe
20/30ft jump option
20/30ft jump option
we are still looking at building a jump line next to the superpipe but with all the new snow going into virgin terrain has been lower priority.
As this snow cycle comes to an end we should have all of these changes finished by monday.
later skater
Eric