I'm in charge of updating that, and i would love to post the update but the webdesigner isn't done with the program yet. I think that he should have it done this week so as soon as he does i will update it. Sorry.
Well, surprise, surprise. Today the park was amazing. There was a hit at the top that was prolly 15-20 feet but noce pop, nice landing. Perfect for getting your legs back, or learning new small stuff. It was great for switch. After that was the huge afformentioned spine. There was also the C rail on the right side, and on the other side of the run there was the 14 foot flat, then the 16 foot single barrel set up in a row so you can put some fun lines down. overall it was a sick first legit park day. Thanks Tad.
Ok... the jump line at perfects is sick. All you locals should try to make it out this weekend. The first hit is like 15-20. then next is a really tall step up, but if you carry enough speed and go voer the knuckle its like a table with an extreme amount of pop. the bottom hit on the left is like 20 feet, and the one on the right is like 35 or so, but built so good. you can take it bigger than 35 if you'd like. the best part is hitting them all in a row. and we have the wallride, 30 foot flat, and c rail out. and Jam session has 4 rails (Rainbow, little kink, 16 foot single barrel i think, and one of the short flat bars) and a small hit. looks sick.
i have been going to mad river from dayton, only because it is much cheaper than perfects. i would like to get a pass to perfect, but they are like $400!! does anyone know of any discounts or anything, i'd like to go there at least twice a week, so i need a full pass. i want to start going there next week, that park setup sounds sick.
we had a bullwheel bearing problem which took all day and we still dont have it done, and a pump station to dig out and rerun some pipe to, then after that if we arent super swamped we will hopefully get the stairs finished... could be a week, could be a month never can be too sure..
park was updated today. rasta rail got put on the side of the step up, the step up got a lot more poppy, the c-rail got turned around so it faced the other way and the wall ride was taken out for a bit. what i heard was that a rail line was being set up whenever the rails were ready, but i might of heard wrong so don't take my word for it.
And theres is skirted so you can use it like a wallride. its the Swingset Rail. you'll see it. And today was sick. Wally was set up on a really tall pule with a sick tranny. And everything was perfect.
if all goes as planned, suzy the s rail and the new staircase will be out in the morning.... we skirted, and painted it all day, so as long as we dont have any trouble it should be out tomorrow
This thread was pretty dead, but i'm gonna use it as a PNS park update thing. They redid the jump line today sorta. The first hit is like 15-20.... the second is 35, and the last one is 50. The big kicker is on the bottom left now, so you can hit all the biggest hits in a row. and the smaller side (right side) on the bottom is like 30 maybe. The speed is slow today because of the recent snowmaking, but they're gonna be sooo fun when the speed gets better.
Yeah Perfect really stepped it up this year, good rails like always, and they are actually getting a good jump line instead of pointless jumps then a nice one at the bottom. Good job and keep it coming