2009 Southside Park Opening - Mont Tremblant News
Members: 115
Auto Accept: Y
Public Forum: Y
 
online footer
2009 Southside Park Opening
Posted Jan 11th 2009 7:11PM by Pierce Ujjainwalla - 3 comments - Average rating 10.00 of 2 ratings

It starts off with a 30 foot down rail set up urban:

Click for larger image

Then it goes into another down rail, a little shorter, also set up urban (we found this one was a little sticky though)

Click for larger image

Then as you can see in the background of the last picture, it goes into a mellow c-box.

Click for larger image

After that you've got the ledge box and the other c-box.

Click for larger image

After all the jibs they've got three solid jumps set up. I really like how they've built them this year, although it takes awhile to get the speed figured out. Here is a look from the top:

Click for larger image

Here is the second jump, and the best one in my opinion:

Click for larger image

And then it ends off with one final jump and the wallride at the bottom. Looks like its gonna be a good year!

Click for larger image

Bookmark and Share
Average Rating: 10.00 of 2 ratings
My rating: N/A
Login To RateLogin To RateLogin To RateLogin To RateLogin To RateLogin To RateLogin To RateLogin To RateLogin To RateLogin To Rate
Comments
Posted By
That looks Sick
JibbinManiac
Jan 11th 2009 at 11:30:40pm
word i was there yesterday too. it was weird how the snow got a lot slower as the day went on. i wonder where theyre going to put the last two jibs from north park, those are so fun
JoshHotz
Jan 12th 2009 at 11:35:32am
^yeah I think I would rather they had those at the top of the park as opposed to the two down rails.
Dishwalla$
Jan 12th 2009 at 3:35:02pm